Assumptions
Jump to navigation
Jump to search
A001 - One Performance Review will be performed in the term of this engagement.
A002 - Progress Meetings will be conducted weekly.
A003 - Client will host up to two one-hour meetings per week requiring DXC attendance
A004 - RHEL version and configuration will be aligned with design.
A005 - Current iteration of solution design is based on a single IP subnet with no routing or firewall requirements
A006 - Current iteration of solution design does not include security domain integration
A007 - The resulting development is experimental and needs to be further refined to be production ready.